There were several steel projects performed for the Mercedes Benz of Sugar Land facility. The largest and most grandiose project is the structural steel for a new showroom installed on top of the 5-story garage. Other projects at this facility include the renovation of the mechanic shops and the offices including, the construction of the large porte cochere, installing the facility outriggers, and the perimeter short pipe fence and gates. Additional fabrication and installation include the decorative iron inserts for the garage openings and headache rack tubing at the garage entrance.
Have a Question? Need more information? AG Welding can help.
Thank you for contacting A.G. Welding. We sincerely appreciate your inquiry and will get back to you as soon as possible.
Regards,
A.G. Welding
(713) 988-4200
www.agwelding.com
© 2024 A.G. Welding | All Rights Reserved | Privacy Policy